S.R.
0119, Section B11
Fayette
County, PA
Construction
inspection and documentation services for Point Marion Bridge replacement, bridge painting,
roadway resurfacing and guide rail installation. Client: PENNDOT District
12-0
Uniontown, PA
Project Cost: $8.0M
Completion Date: 1999 |
More Project Aerial Photos |
|
Construction, inspection and documentation on S.R. 0119, Section B11 and S.R. 0201,
Section 05R, Fayette County, PA. The
construction of a three-span steel girder bridge and the removal of an
existing three-span steel truss bridge over the Cheat River.
S.R. 0201, Section 05R included the surfacing of existing pavement
with a bituminous wearing course, ID-2, RPS on a bituminous binder course,
leveling course, and the miscellaneous construction of roadway approaches,
drainage, guide rail, highway lighting, signing, and pavement marking, all
with a project length of 3.25 miles |