S.R. 0022 Section 480

Indiana County

Construction inspection and documentation of the Route 119 and Route 22 Interchange Project  Interchange reconfiguration  and construction of a new bridge is being put into place that will carry Route 22 over Route 11

Client:  PENNDOT District 10-0

             Indiana County, PA

Project Cost:  $28.8 M

Completion Date:  Fall 2003

More Project Construction Photos

 Bridge Beam Installation

 

PENNDOT Project Website

Construction of an interchange and ramps using subbase, no. 2A and permeable base course; plain cement concrete pavement (RPS); placement of concrete shoulders, Type 1; major excavation and embankment; construction of simple span composite prestressed concrete I-beam bridge; construction of a precast concrete box culvert; erosion and sedimentation control; highway signing; temporary traffic signalization; construction of township roads and service roads using Superpave base, binder and wearing courses; highway lighting; sewage encasement installation; water line relocation; guide rail and drainage all within 2.9 miles.

 

  T. W. CONSULTANTS, INCORPORATED

Engineers and Planners
5500 Corporate Drive ·  Suite 300  ·  Pittsburgh, PA  ·  15237
Phone: (412) 369-7500  ·  Fax: (412) 369-7964 

Copyright © 2000 T.W. CONSULTANTS INCORPORATED

  All rights reserved.