S.R. 0026, Section C02
Centre
County, PA
Construction
inspection and documentation services for the construction of a four-lane
limited access highway with 3.5 miles of new alignment and 7.1 miles of
ramps and interchanges including nine bridges and two retaining walls.
Client: PENNDOT
District 2-0
Clearfield, PA
Project Cost: $83.5M
Completion Date: 12/ 2002 |
.gif) |
|
Construction of separated highway consisting
of concrete pavement on subbase with concrete shoulders, interchange roadway
and ramp construction, surfaced side road construction, single span
composite steel multi-girder bridge, composite prestressed concrete I-beam
bridges, composite steel multi-girder bridges, simple and continuous
composite prestressed concrete I-beam
bridge, dual 3-span continuous composite prestressed concrete adjacent box
beam bridge, 3-span simple composite prestressed concrete spread box beam –
widening bridge, cast-in-place concrete box culvert, precast concrete box
culvert and extension, soldier pile/reinforced concrete retaining wall, MSE
retaining wall, interchange lighting, signing, guide rail, drainage, traffic
signals, utility relocations of sanitary sewer and water lines.
|