Project Description

S.R. 0026, Section C04 

Next  Project

Previous Project

SR 26 -  Bridge over SR 550  - Looking East

 

SR 26 -  SR 550  Interchange - Looking East

More Project Aerial Photos

S.R. 0026, Section C04 

Centre County, PA

Construction inspection and documentation for a  3.6 mile segment of a new two-lane separated highway and four structures located in Spring Township

Client:  PENNDOT District 2-0

             Clearfield, PA

Project Cost:   $10.4 M

Completion Date:  1998

Project involved the construction of 2.42 miles of separated highway consisting of plain cement concrete pavement, RPS; 0.6 miles of bituminous paving consisting of subbase, bituminous concrete base and binder course, ID-2 and bituminous wearing course, SRL-H; also two single span bridges; the rehabilitation of two existing bridges with bituminous widening and bituminous overlay; 0.6 miles of bituminous roadway transition from 4 lanes to 2 lanes consisting of bituminous concrete base and wearing courses, ID-2, SRL-H, leveling course, bituminous wearing course ID-2, SRL-H; bridge approach slabs, and pavement relief joints. 

Project Location Map

 

  T. W. CONSULTANTS, INCORPORATED

Engineers and Planners
5500 Corporate Drive ·  Suite 300  ·  Pittsburgh, PA  ·  15237
Phone: (412) 369-7500  ·  Fax: (412) 369-7964 

Copyright © 2000 T.W. CONSULTANTS INCORPORATED

  All rights reserved.