Project Description

S.R. 0080, Section B07

Next  Project

Previous Project

I-80 Bridge over S.R. 219 - Looking East

I-80 Mile 123 - Looking West

S.R. 0080, Section B07

Clearfield and Jefferson Counties, PA

Construction inspection and documentation for the rehabilitation of approximately twenty-six miles of both east and west bound lanes. of Interstate 80 including 15 bridges between DuBois and Clearfield.

More Project Aerial Photos

Client:  PENNDOT District 2-0

             Clearfield, PA

Project Cost:  $47M
Completion Date:  1996

      Bridge work consisting of six (6) complete replacement structures, seven (7) bridges with major repairs and deck replacements, and two (2) three-span continuous composite steel plate girder bridges.  Major work items included:  10" concrete pavement overlay, blacktopping, 13" concrete paving, open graded subbase (OGS), concrete slab rehabilitation including jacking, patching and sealing, under drains, base drains, extending pipes, rebuilding of inlets, building and removal of temporary ramps and median crossovers, installing new signs and guide rails, joint sawing and sealing, maintaining and protecting traffic and traffic control devices, pavement marking, setting and removal of double face concrete barriers, installation of weigh-in-motion scales, reconstruction and/or rehabilitation of structures including replacement of decks, pier caps, diaphragms, back walls, wing walls, parapet wall, conduits for future lighting, removal and resetting of beams, structural painting, and replacement of approach slabs, etc.  

 

 

  T. W. CONSULTANTS, INCORPORATED

Engineers and Planners
5500 Corporate Drive ·  Suite 300  ·  Pittsburgh, PA  ·  15237
Phone: (412) 369-7500  ·  Fax: (412) 369-7964 

Copyright © 2000 T.W. CONSULTANTS INCORPORATED

  All rights reserved.