S.R.
0080, Section
B07
Clearfield
and Jefferson Counties, PA
Construction
inspection and documentation for the rehabilitation of approximately
twenty-six miles of both east and west bound lanes. of Interstate 80
including 15 bridges between DuBois and Clearfield. |
More Project Aerial Photos

|
|
Bridge work consisting of six (6) complete
replacement structures, seven (7) bridges with major repairs and deck
replacements, and two (2) three-span continuous composite steel plate
girder bridges. Major work
items included: 10"
concrete pavement overlay, blacktopping, 13" concrete paving, open
graded subbase (OGS), concrete slab rehabilitation including jacking,
patching and sealing, under drains, base drains, extending pipes,
rebuilding of inlets, building and removal of temporary ramps and median
crossovers, installing new signs and guide rails, joint sawing and
sealing, maintaining and protecting traffic and traffic control devices,
pavement marking, setting and removal of double face concrete barriers,
installation of weigh-in-motion scales, reconstruction and/or
rehabilitation of structures including replacement of decks, pier caps,
diaphragms, back walls, wing walls, parapet wall, conduits for future
lighting, removal and resetting of beams, structural painting, and
replacement of approach slabs, etc. |