S.R. 0026, Section C02

Construction Photos

 

S.R. 0026, Section C02

Centre County, PA

Click on Photo for Full Screen View

Use Back in Web Browser to return to this page 

 

322 Bridge Demolition

Bridge Pier in front of Beaver Stadium

Structures 7A and 8A over Park Avenue

Girder at East Abutment

Box Girder

Ranp W-East

Parapet Wall Slip Form

Finishing Parapet Wall

Pavement Tining and Sealing

Material Testing Lab

Structures 7A and 8A at 322

Westbound

Structure No. 3

Retaining Wall at S.R. 3007

 Ramp W-N and S.R. 0322 Westbound

Park Avenue Overhead Sign Structure

Overhead Sign Structure -Penn State Exit

Ribbon Cutting -

November 2002

 

 

 

Marching Band at Ribbon Cutting

 

 

 

 

  T. W. CONSULTANTS, INCORPORATED

Engineers and Planners
5500 Corporate Drive ·  Suite 300  ·  Pittsburgh, PA  ·  15237
Phone: (412) 369-7500  ·  Fax: (412) 369-7964 

Copyright © 2000 T.W. CONSULTANTS INCORPORATED

  All rights reserved.